House Demolition
Full and partial knockdowns of brick-and-tile, weatherboard and double-storey homes, permit through to level site.
Learn more →The demolition half of a pool job — draining, isolating services, breaking out the structure and getting the material off site.
Pool demolition is the part with the excavator: drain, isolate, break out, load, cart. It is straightforward work done by people who have done it before, and genuinely unpleasant work done by people who have not. Concrete pool shells are thicker and more heavily reinforced than most people expect, and the bond beam at the top is often the hardest part of the structure on the property.
The pools that come out around Perth fall into a few groups: reinforced concrete and sprayed concrete in-ground pools, fibreglass shells, above-ground steel and resin pools, and the solid concrete above-ground structures that turn up on sloping blocks and are always a bigger job than they look.
Draining is first, with the water directed to an approved discharge point. Then the services: plumbing lines cut and capped, and the electrical supply to the pump, filter and lights isolated by a licensed electrician before anyone starts breaking concrete.
The shell itself depends on what it is made of. A fibreglass pool is cut into manageable sections or lifted out whole where access allows, which is fast and produces relatively little waste. A concrete pool is broken down with an excavator-mounted hydraulic hammer, and the reinforcing steel is separated from the rubble as it goes so the concrete can be recycled and the steel sold as scrap.
Surrounding surfaces come off at the same time. Coping, paving, aprons and decking all need to be clear before the shell can be worked properly, and they are part of the same waste run — the approach is the same as on the concrete removal page.
Two identical pools on two identical blocks can differ by thousands of dollars, and the reason is almost always how a machine gets to them. A wide side gate or a drive-through carport means a standard excavator and trucks parked close. A narrow side access, an established tree you want kept, a steep drop to the backyard, or a rear-of-block pool behind a two-storey extension means smaller machines, more passes, dumpers running rubble out to the street and a longer day.
Perth's sandy soils help here. Free-draining Swan Coastal Plain sand means excavation walls behave predictably and there is no water sitting in the hole while you work. On the limestone side of the metro, around Fremantle and the Scarborough dune line, some shells are set into rock, and that is slower.
A demolished pool is an open excavation, and it does not stay open. The backfill, compaction and certification side of the work — including the engineered fill you need if anything is ever going to be built over it — is set out on the pool removal and filling page. Almost every job we quote covers both stages together.
If the pool is being cleared as part of a larger project, it usually gets scheduled alongside the house demolition or the site clearing so the machines and trucks make one trip instead of three. Costs for each stage are in the demolition cost guide.
Call (08) 9516 0951 and tell us the pool type, the approximate size and how wide the narrowest point of the access is.
Full and partial knockdowns of brick-and-tile, weatherboard and double-storey homes, permit through to level site.
Learn more →Fibreglass and concrete pools removed, the void backfilled in layers and compacted ready for whatever comes next.
Learn more →Internal demolition for offices, shops and homes — walls, ceilings, floors and fit-out stripped back to structure.
Learn more →Cabinetry, benchtops, splashbacks and floor finishes out, services capped, floor ready for the new install.
Learn more →Vanity, bath, toilet, wall tiles and screed removed cleanly so waterproofing can start on a sound substrate.
Learn more →Pre-1990 Perth homes need an asbestos check first. We arrange licensed removal before demolition starts.
Learn more →Colorbond sheds, limestone and brick garages, carports and patios removed, slab included if you want it gone.
Learn more →Vegetation, rubble, old slabs and fencing cleared off a block so the builder can set out and start pegging.
Learn more →Driveways, paths, patios and slabs broken out and carted to a recycler rather than straight to landfill.
Learn more →Household, commercial and construction waste collection — you pay for the volume you actually put on the truck.
Learn more →Bulk mulch delivered across Perth, useful once a cleared or backfilled site needs covering before landscaping.
Learn more →Bulk earthworks, site preparation and plant hire for larger residential and commercial projects.
Learn more →They are two halves of the same job. Demolition is breaking out and carting away the structure: the shell, the bond beam, the coping and the surrounding concrete. Removal is that plus the backfill, compaction and site restoration that leaves usable ground behind. Most residential jobs are quoted as the complete package, because a demolished pool with an open hole is nobody's finished project.
Usually, but the machine size dictates the price. Where a standard excavator can get down the side of the house the work is quick. Where access is a 900mm side gate, the job moves to mini excavators fed through the opening, or occasionally a crane lift over the roof, and the day rate climbs accordingly. Access is the first thing we look at on site.
Skimmer lines, return lines, suction lines and the backwash run are cut and capped or pulled out with the shell. Power to the pump, filter, chlorinator and any pool lights is isolated by a licensed electrician before demolition, not cut live on the day. Pool equipment and the slab it sits on are removed with the rest unless you ask to keep them.
That is normally part of the scope and it is worth including. Coping, surrounding paving, concrete aprons and timber or composite decking all have to come off before the shell can be reached properly, and leaving an island of paving around a filled void looks exactly like what it is. It is priced as part of the concrete and hard-surface removal.
Occasionally, and it is worth checking. Older pool sheds, pump housings and fencing infill panels around Perth pools built before 1990 were sometimes built with asbestos cement sheeting. The pool shell itself will not be asbestos, but the structures around it can be, and that changes the sequence because licensed removal has to happen first.